Non-Technical Summary

The below document is the Non-Technical Summary (NTS) of the Environmental Impact Assessment (EIA) Scoping Report for the proposed Inch Cape Offshore Wind Farm.
 
This document provides an overview of the contents of the Scoping Report, which presents details of the proposed project (wind turbines, inter-array cabling and associated offshore infrastructure) together with the environmental information associated with the development area.  The Scoping Report provides detailed information to allow statutory and non-statutory consultees to give their opinion on the proposed scope of the EIA and to gather further information about siting offshore turbines in the marine environment.

scoping Report

Within the full Scoping Report, the potential impacts of the project have been identified, along with the cumulative and in-combination impacts, following which the further assessments required for the EIA have been presented together with a proposed scope of works.

The NTS was intended to provide an easily accessible overview to encourage a broad range of stakeholders to examine our proposals.  For more detailed information please refer to the full scoping report.

Document Description Published Link
Inch Cape Scoping Report Non-technical Summary A non-technical summary of the Inch Cape scoping report. 12-08-2010 Download file

Project News

Sign up for news updates